Project Manager for the City of Fort Collins, Colorado, Solids Processing Improvements-Phases 1, 2 and 3.  In Phase 1 of these modified design-build projects, Mr. Peters led the design of the modifications to the existing anaerobic digesters including converting the digester lids from gas-holding covers to gas-holding, spiral-guided, floating covers.  Additionally, new ATARA gas mixing systems were designed, as well as a chemical feed system for hydrogen sulfide control.  Phase 2 involved modifications to an existing structure to hold two, new, high-solids dewatering centrifuges.  This work included pumping and piping replacement and installation of shaftless screw conveyors.  Phase 3 involved construction of a new anaerobic digester, repiping of the entire digester complex and installation of a new boiler and heat exchanger.

 

Project Manager for the City of Fort Collins, Colorado, Solids Study. Mr. Peters evaluated and made recommendations for improving and expanding the solids processing facilities for the City’s two wastewater treatment plants.  The study evaluated different thickening, stabilization, and dewatering alternatives including dissolved air flotation thickeners, egg-shaped digesters, centrifuges, and belt presses.  As part of this work, Mr. Peters received SDIC training (Systematic Development of Informed Consent).  This unique training program provides participants with tools for handling difficult issues that are subject to opposition from the public.

 

Project Manager for the Southern Ute Indian Tribe Wastewater Treatment Plant, Ignacio, Colorado.  Mr. Peters managed design and construction management of this new 0.8 mgd wastewater treatment plant.  This facility utilizes rotary screening, grit removal, an oxidation ditch for nitrification and denitrification, ultraviolet irradiation for disinfection, and aerobic digestion, high-rate drying beds, and air drying for biosolids treatment.

 

For the City of Fort Collins, Colorado, Mulberry Water Reclamation Facility design and construction project, Mr. Peters served as project engineer and coordinator for design development, detailed design, and construction of plant improvements including ultraviolet disinfection system, flume/splitter structure, operations building, septage waste treatment station, yard piping, electrical and instrumentation work.  This $2.5 million project utilized a variation of the “design-build” process.  In this instance, a contractor was brought on board following pre-design to provide input on value engineering, constructability, and cost estimating.

 

City of Farmington, New Mexico, Wastewater Collection and Treatment System Master Plan.  Mr. Peters provided quality assurance and quality control for this master planning effort which involved population projections, wastewater treatment alternatives development, cost estimating, evaluations and recommendations.